Hydropower Tunnel Tumpen is part of the development of the new Tumpen-Habichen power plant, which is scheduled to go into operation in autumn 2022. This formwork was used for the construction of a 900 m water
tunnel of this hydroelectric power plant. A full-section formwork featuring a very thorough, precise and complex engineering development, carried out by our client, Kern Tunneltechnik.